Pump Assembly:
Complete, ready to install (includes effluent pump, check valve
and
floats) Control Panel: Includes high-water alarm on panel PVC pipe and fittings: 1 1/4” to 4” 8” graveless drainfield pipe PVC Primer and Glue Reemay Filter Wrap (12-inch and 36-inch width rolls)